chhatrapati shivaji maharaj terminal - mumbai
Post on 20-Mar-2022
10 Views
Preview:
TRANSCRIPT
2
ABOUT IRSDC
BOARD OF DIRECTORS
Chairman (MI/ Rly Board)
MD & CEO
SHAREHOLDINGSTRUCTURE
IRCON50%
RLDA
50%
4 Promoter DirectorsSince Sep 2017, a 50:50 JV of IRCON and RLDA (RITES
to be third promoter)
2 Functional Directors
3 Government Nominee
Directors MoR, NITI, DEA
⮚ IRSDC is the Nodal Agency for station development program; 8603 stations entrusted
⮚ IRSDC shall approve its own plans in consultation with local bodies; Generally following National TOD policy
⮚ No change in land use required pan India
3
Segregation of
Arrival and
Departure
Passengers
Lifts & escalators
for Passengers
convenience
Conservation of
existing natural and
built environment
Cleanliness on
priority by
Design
Clear & Fast
communication
systems
Creating a City
Center
Convergence
of modes
CREATING RAILOPOLIS: SEVEN ‘C’S
Secunderabad Station
(01.04.2019)
Anand Vihar Terminal
(01.03.2019)
Chandigarh Station
(20.03.2019)
Bengaluru City Station
(05.02.2019)
Pune Railway Station
(14.02.2019)
INTEGRATED FACILITY MANAGEMENT BY IRSDC
At the time in England, the revival gothic style was in vogue, and when mixed with traditional Indian architecture it gave rise to an “Indo-Saracenic style”. VT station is mostly revival gothic style, as St Pancras station in London, which influenced its design.
the INSPIRATION
1899
CSMT is a declared UNESCO Heritage structureSince 2004, CST station (the old building) is listed as a world heritage site by UNESCO.Around the building are 3 buffer zones : the railways boundary (and then the project), include buffer zone 1 and buffer zone 2.
1. Creating a Multimodal hub for suburban in heritage station (releasing it from LD trains and orchestrating the people flow outside Steven’s building)
2. Creating a Multimodal hub for long distance trains in the former maintenance and stabling yards3. Creating links between the 2 hubs and between the port and the city center (releasing heritage zone from
thousands of pedestrians)4. Creating a private development to finance the station development
the STRATEGY
Three particular open area:a
b. The back garden and the street
c. The Heritage square with a common access to the buildings
a. The Heritage yardb
c
Key aspects for the Heritage area:
3. Transparency allowing view towards hospital (greenery)
1. Views towards the main dome
2. Quality of the public space
Strategy in Long Distance side
1. More waiting space for passengers
2. Distinction between the LD and Suburban service
3. Urban links running north-south and east-west
4. Infrastructure as catalyst for new city center
Before
After
STRATEGY – Create concourse for long distance passengers – Heritage views in background
Corridor depicting the high colonnade structure casting shadow on the internal corridor and
also the second façade consisting of the perforated screens (jaalis) which help in the
ventilation of the building
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS – LD Station Views
Request for Qualification - CSMT● Extended O&M period for 60 years for station.● Long Term lease-rights for real estate: Upto 99
years for residential format & 60 years for non-residential formats.
● User charge, a continuous revenue to the concessioner after COD.
● Development to be done broadly following National TOD policy
● No Change in Land use is required.● No prior environmental clearance required ● IRSDC a single window for approval of master plan
and building plans
Eligibility Criteria (only FINANCIAL)
▪ Minimum Net worth: Rs. 821 crore at the close of preceding financialyear OR
▪ Minimum ACI: Rs. 821 crore at the close of the preceding financial year (for AIF or Foreign Investment Fund).
Construction Experience (To be met before Appointed Date) (1/2)▪ Eligible Period: Past 5 financial years preceding the Bid Due Date.▪ Paid for, or received payments for, construction / development of
Eligible Project(s) such that the amount is:• 80% of Estimated Project Cost from One Eligible Project, or• 60% of Estimated Project Cost each from Two Eligible Projects, or• 40% of Estimated Project Cost each from Three Eligible Projects,or• 30% of Estimated Project Cost each from Four Eligible Projects
Construction Experience (To be met before Appointed Date) (2/2)
Eligible Projects:
(a) Passenger terminals shall mean having a minimum passengerhandling capacity of 5000 persons /day in railway stations, metrostations, airport terminals (with or without related airportinfrastructure works), ports, integrated check posts, and busterminals;
(b) Railways sector shall mean railways, metro, high speed railwayincluding Maglev and other rail related projects including tracks,bridges, tunnels; and
(c) Social and Commercial infrastructure shall mean:
(i) development of a commercial real estate project (includingeducation institution, hospital, hotel, convention centre) at asingle site with a minimum built up area of 150,000 (onehundred fifty thousand) square meters;
(ii) development of a residential real estate project at a single sitewith a minimum built up area of 300,000 (three hundredthousand) square meters; and/or
(iii) development of a residential township with a minimum area of100 (hundred) acres and a minimum built up area of 300,000(three hundred thousand) square meters.
top related