die diagramme sind noch nicht zu ende gedacht. · 2019. 9. 19. · die diagramme sind noch nicht zu...
Post on 28-Mar-2021
2 Views
Preview:
TRANSCRIPT
Die Diagramme sind noch nicht zu Ende
gedacht.
1 1
Better and sustainable construction
opportunities with BIM
GBC Slovenija
12. September 2019
Note: As of 2017
Brands
Production-/Sales-activities in
20/30Countries
Revenue
€1.5Billion
Employees
7.000
EBITDA
€250Million
Productionfacilities
99
Die Diagramme sind noch nicht zu Ende
gedacht.
Circular economy with Xella products
“The philosophy of the circular economy is focusing on making the most of resources throughout their life cycle to promote
sustainability of the economy, society, and environment.”
PRODUCTION
Ytong close cycle production
AAC granulates for animal hygiene
Silka element kit based on BIM design
USE
Ytong, Silka, Multipor, Hebel with a
life cycle of over 80 years without
maintenance on the material
RE- & UPCYCLING
Ytong Silent+ with more than 10%
AAC residuals
AAC demolition materials as sand
substitute
Die Diagramme sind noch nicht zu Ende
gedacht.
BIM model check for planning
and optimization consulting as
basis for material selection and
unitization
Material awareness
and prefabrication
Optimized construction
process to shorten
construction time
Big Bags and
recycling solutions
like Ytong Silent+
Digitalization in construction to support circular economy
Optimized construction site logistics
and just-in-time delivery
P. 6
BIMdigital planning
sustainableIPDDataIFC
CD
EB
ette
r
BC
F
management
Die Diagramme sind noch nicht zu Ende
gedacht.
BIM in the design phaseBasic data for sustainable construction solutions
Xella product database
BIM model exchange in IFC or RVT
format
Xella Consulting on the BIM Model
Materials, structural design, building
physics, alternative products
Xella BIM Model Check Protocol
Management via BCF
Xella BIM masonry model with material
properties
EPD Information integrated in building
components
Design
Detail
planning
Tendering
Production
Construction
Logistics
Commission-
ing
Die Diagramme sind noch nicht zu Ende
gedacht.
Production plant:
Plant data
Packaging data
Availability
Delivery:
Date and time
Ingredients:
Sand
Recycling materials
Lime
Cement
Water
…
Product
Non geommetrical information
Property Set
Geometry/Position
Lambda value
Comprehensive strength
Fire resistance
…
LCA data within BOPC
ecological footprint
Classification
DIN EN ISO 16739 - IFC Classification: Wall
UNSPSC Name: Structural building products
UNSPSC code: 3013
OmniClass Number: 23-13 21 11 - Title: Concrete Masonry Units
…
Planning Production
BIM in the design phase Transparent product information in the digital twin
EPD data in
building
components
(test phase)
EPD data in
building
components
(test phase)
Die Diagramme sind noch nicht zu Ende
gedacht.
Design
Detail
planning
Tendering
Production
Construction
Logistics
Commission-
ing
BIM in the detail planning phase Optimization in the collaboration model
Unitization of masonry walls
Initial production optimization
Considering short delivery routes with
nearby factory
Standard details
Delivery of details (CAD)
Coordination with engineering disciplines
Material optimization and interface
management
Die Diagramme sind noch nicht zu Ende
gedacht.
Collision check in the
planning stage with specific
object information
Die Diagramme sind noch nicht zu Ende
gedacht. Final detail unitization of masonry walls
Exact bill of materials based on
production factory selection
Detailed documentation of the wall views
Time-saving execution on site
Fully automated production
Wall materials get produced, cut and
packaged according to planning
Reduction of waste materials to a
minimum
Set-up digital order processes
Collaboration with construction
company
Design
Detail
planning
Tendering
Production
Construction
Logistics
Commission-
ing
Circular economy in productionObject-related production and closed production cycles
Die Diagramme sind noch nicht zu Ende
gedacht.
Using the segmentation
model for controlling
manufacturing machines
Die Diagramme sind noch nicht zu Ende
gedacht.
Fully automated production
Robot-controlled prefabrication
on the basis of the element model
Die Diagramme sind noch nicht zu Ende
gedacht.
Fully automated production
Robot-controlled prefabrication
on the basis of the element model
Die Diagramme sind noch nicht zu Ende
gedacht.
Design
Detail
planning
Tendering
Production
Construction
Logistics
Commission-
ing
Compilation of deliveries
Adapted to the construction process
Utilization optimization of delivery
vehicles
Minimization of freight efforts
Exact marking of the goods
Reduction of non-productive time on
the construction site
Benefits of BIM for supply chains Contribution to sustainability through optimized delivery flows
Die Diagramme sind noch nicht zu Ende
gedacht.
Design
Detail
planning
Tendering
Production
Construction
Logistics
Commission-
ing
Benefits of BIM for supply chainsProject-related optimal utilization of freight space
Delivery of predefined wall segments
Adapted to the construction process
Just in Time delivery according to
schedule
Optimization of unloading processes on
the construction site
Track and Trace solutions
Ongoing coordination within the supply
chain to avoid waiting times
Die Diagramme sind noch nicht zu Ende
gedacht.
Design
Detail
planning
Tendering
Production
Construction
Logistics
Commission-
ing
Sustainable and ressource efficient constructionCollection and reuse of material from site
Provision of work plans and collaboration
with construction company
Adapted to the construction process
Development and first use of AR
technology on the construction site
Minimization of the number of printed
drawings, always the latest version on
the screen
Scrap redemption for recycling with big
bags
Re- and upcyling concepts like Ytong
Silent+, cat litter, oil-binding granulates
Die Diagramme sind noch nicht zu Ende
gedacht.
Mixed Reality/AR
Hololens® on site
Die Diagramme sind noch nicht zu Ende
gedacht.
Circular economy with Xella products
Collecting Treatment Recycling New use
Many thanks and a successful day!
Markus HeßeHead of International Product ManagementXella Baustoffe GmbHDüsseldorfer Landstraße 395 • D-47259 Duisburg Telefon +49 (0) 203 60880-7530markus.hesse@xella.com • www.xella.com
top related