Management of Management of megasitemegasite remediation after the remediation after the
economic upheaval in Eastern Germanyeconomic upheaval in Eastern Germany
–– The The BitterfeldBitterfeld case case ––
Presenting:
Administrative, organisational and financial issues M. Keil, LAF
Conceptual approach J. Grossmann, GICON
Integration of research results H. Weiss, UFZ
Kiel
Hamburg
Bremen
Schwerin
Hannover
Magdeburg
Berlin
Potsdam
DresdenErfurt
Düsseldorf
Wiesbaden
Mainz
Stuttgart
München
Saarbrücken
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Economical consequences of the collapse of the former GDREconomical consequences of the collapse of the former GDR–– From planned economy to market economy From planned economy to market economy ––
• As result of the political and economical collapse of the former GDR, the central-planned economy came to an end
• Market-economy had to be established
• Enterprises in public ownership had to be transferred to private ownership
• Private investors for former state-owned companieshad to be found
Investment restraint
contaminated sites
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Estimated remediation costs for contaminated sitesin the former GDR
0
10
20
30
40
50
60
1990 1995 2000
Bill
ion
€
Reduction of the estimated remediation costs due to the conceptual approach since the early 90s.
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Remediation costs for contaminated sitesin the State of Saxony-Anhalt
0
0,5
1
1,5
2
2,5
3
Saxony-Anhalt spent until 2005
Bill
ion
€
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Remediation Remediation costscosts –– obstacleobstacle for for privatisationprivatisation ??
Combination: privatisation and management of contaminated sites
financial organisational
Partial or completeexemption of investors fromliability for residual pollution
Establishment of adequatemanagement structures
for site remediation
Responsibility for process of privatisation public institutions
Main aspects ofthe approach
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Kiel
Hamburg
Bremen
Schwerin
Hannover Magdeburg
Bitterfeld-Wolfen
Berlin
Potsdam
DresdenErfurt
Düsseldorf
Wiesbaden
Mainz
Stuttgart
München
Saarbrücken
0 100km
Mining activitiessince 18th century, increase in the19th centuryconsiderablechanges in thegroundwaterregime
TheThe Bitterfeld Bitterfeld casecase –– TheThe European European megasitemegasite
End of 19th century: firstsettlementsof chemicalindustry, mainlychlorochemistryLater:
additional productionof aluminium, pesticides, fertilizer, tensides etc.in total 5000 products
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
EconomicEconomic collapsecollapse of of thethe regionregion
• Stop of coal production
• Break-down of chlorine chemistry
• 70 % of the jobs lost
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
ConsequencesConsequences of of thethe site site useuse
Ecological problems:
• Contaminated groundwater
• Contaminated soil
• Raising groundwater table
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Political decision:Continuous site use instead of demolition
Parallel activities:
• Remediation
• Search for investors
• Industrial production
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Need for parallel consideration of various interests
• Private investors
• Affected public
• Communal instances
• Regional instances
• Federal instances
• Recultivation of mining areas
• Groundwater management
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Stakeholder Stakeholder organisationorganisation in Bitterfeldin Bitterfeld
Federal institution
supreme authority
competent authority
project manager
engineer consultant
competent authority
and projectleader
board
stakeholder
=authorityLegend:= finance
BMF: Federal Ministry of Finance FuB: Manager of Privatisation Contracts on behalf of Federation
SAK: special expert group for groundwater problemsby Goitzsche refilling
StuBA: Tax and budget committee
MRLU:State Ministry of Environment
LaVw: Landesverwaltungsamt, Dessau
LA Geol: Landesamt für Geologie und Bergwesen
=contractcLRA: Landratsamt
MW: State Ministry of Economy
Mining pit redevelopment Groundwater remediation (ÖGP) Improvement of infrastructure
c
c
c
c
cc c
c
StuBA
BMF FuB
MW
LMBV
LA Geol
LAF
SAK Goitsche
control boards
MDSE
concept developer
RPLRA
contractorscontractors
municipalities
inhabitants
P-D CPG
investors
MRLUMW MRLU
LaVw
Source: MDSE
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Administrative and organisational structures in Saxony-Anhalt today
– considering remediation of contaminated sites –
• 2000/2001 transfer of complete responsibility to the State Saxony-Anhalt
• Payment of a lump sum of 1 Bill. € for remediation
• Establishment of special organisation LAF (State Authority for exemption from residual pollution liability)
Mission:
To overcome contamination as obstacle for investment
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Administrative and Administrative and organisationalorganisational issuesissues √√
ConceptualConceptual approachapproach neededneeded
Management of Management of contaminatedcontaminated megasitesmegasites
√√Financial Financial issuesissues
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Industrial landfills
City of Greppin
Industrial area
City of Bitterfeld
Abandoned opencast mines
soil and groundwater
contamination due to
chemical production
over decades
soil and groundwater
contaminationdue to
inadequatedepositing of
industrial wastes
raising of groundwater
table after closure of
lignite mining pits
Problems at Problems at thethe Bitterfeld Bitterfeld megasitemegasite
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
ContaminationContamination situationsituation –– quaternaryquaternary / / tertiarytertiary aquiferaquifer
Wolfen
Bitterfeld
Greppin
Quaternaryaquifer
Wolfen
Bitterfeld
Greppin
Tertiary aquifer
Groundwater flowdirection
> 100 mill. m3
contaminatedgroundwater
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Initial Initial situationsituation 1990 1990
Problem:
• Large-scale soil and groundwater contamination
• No conceptual approach
Objectives:
• Site re-use, new investments
• Maintenance of existing industrial areas
Conclusion:• Maintenance of industrial site as base for a sustainable site
remediation• only „living“ sites provide financial means for long-term
remediation
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
ConceptualConceptual approachapproach to to megasitemegasite managementmanagement (1)(1)
1. Crucial point: Assessing the impact of the source in the soil on otherrecepetors than groundwater
?1
?1
Impact from soilcontamination on surface receptors ?
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
ConceptualConceptual approachapproach to to megasitemegasite managementmanagement (2)(2)
2. Crucial point: Assessing the impact of the source in the soil on thealready contaminated groundwater (plume)
2?
2Impact from soilcontamination on groundwater ?
Separation of soil and groundwater management
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Separation of groundwater and Separation of groundwater and soilsoil managementmanagement
Large scale contaminated groundwater acts as independent source
Downgradientsafety or
remediationmeasure
Decoupling ofgroundwater andsoil management
Decontaminationmeasures
Risks posed toother receptors /
Considerable impacton groundwaterremediation or
site re-use?
yes no
Groundwater Soil
Measures not required / not proportionate
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Remediation Framework Remediation Framework ConceptConcept GroundwaterGroundwaterfor for thethe Bitterfeld Bitterfeld megasitemegasite
Phase 1 and 2
Down gradient
and
Up gradient
Hydraulicsafety
measures
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Remediation Framework Remediation Framework ConceptConcept GroundwaterGroundwaterfor for thethe Bitterfeld Bitterfeld megasitemegasite
Phase 3 and 4
Source and plume
Decontami-nation
measures
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Sequence “Bayer”
Sequence ”Greppin”
Sequence “Bitterfeld”
Down gradienthydraulic safetymeasures
protectedgroundwater body
(preconditions for separation of soil and groundwater management achieved)
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Groundwater Groundwater treatmenttreatment in in
BitterfeldBitterfeld
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
CORUSCORUSat at thethe Bitterfeld Bitterfeld
megasitemegasite
before
after
InterlinkingInterlinking remediationremediation and and sitesite developmentdevelopment (1)(1)
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
MDP => DRECO, MILTITZ AROMATICS
before
InterlinkingInterlinking remediationremediation and and sitesite developmentdevelopment (2)(2)
after
MILTITZ AROMATICSMILTITZ AROMATICSat at thethe Bitterfeld Bitterfeld
megasitemegasite
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
About 10.000 jobs; Operation of selected components of the existing chemical industry (before 1990) was continued
New industries was established on-site e.g.:Akzo Nobel Chemicals GmbH Ausimont GmbH Bayer Bitterfeld GmbHBNT Chemicals GmbH Degussa AG Heraeus GmbH Hüls Indulor Chemie GmbH Miltitz Aromatics GmbHQcells GmbH Sidra Wasserchemie GmbH UmesterungsWerke GmbH
The industrial site Chemiepark Bitterfeld-Wolfen before and today
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Berlin Industrie-gebiet Spree
Zeitz
LeunaBuna
Bitterfeld-WolfenMansfelder
Land
Magdeburg-Rothensee
Erdöl-Erdgas Gommern
Südharz
Kali Werra Rositz
BASF
Stadt Brandenburg
Region Oranienburg
Schwedt
SaxoniaFreiberg
Dresden Coschütz/ Gittersee
Lautawerk
SOW Böhlen
Stralsund
RostockWismar
Megasites Megasites in Eastern Germanyin Eastern Germany
Berlin
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
VerificationVerification of of thethe conceptualconceptual approachapproach at at EUEU--levelleveland and compliancecompliance check check withwith EUEU--WFDWFD
The WELCOME-project 2000-2004
Goal: Development of a guideline for the management of contaminated megasites characterised by a large-scalegroundwater contamination
The conceptual approach was successfully applied to otherEuropean megasites and transformed into a guideline
Landesanstalt für Altlastenfreistellung
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
ComplexityComplexity of of thethe problemproblem requiresrequires cooperationcooperationwithwith researchresearch institutionsinstitutions
Integration of R&D results into Integration of R&D results into megasitemegasite managementmanagement
-- SAFIRA SAFIRA –– Research project; 15 partnersResearch project; 15 partners
-- funded by Federal Ministry of Research and Educationfunded by Federal Ministry of Research and Education
-- coco--financing by LAFfinancing by LAF
-- first phase 1999 first phase 1999 –– 20042004
-- second phase 2005 second phase 2005 –– 20092009
-- decision support system as input to management systemdecision support system as input to management system
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
ExampleExample::
traditional approach (i.e. Wiedemeier, U.S. EPA): • contaminant decrease• geochemical footprints• microbiological footprints
in addition, more recent & promising approaches:i. metabolitesii. stable isotopesiii. multi-level samplingiv. BACtrapsv. integrated pumping tests, mass fluxesvi. modellingvii. ...
Making the case for Natural Attenuation
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
NA in Bitterfeld: Tertiary aquifer below the City
LK351
LK342
SAF37SAF16
GOI814GOI819GOI816
GOI813
GOI811
GOI809BVV100
BVV092
BVV5262
BVV5252BVV5242
BVV5232
BVV3072
BVV3062
BVV3052
BVV3042
BVV3032
BVV3022
BVV1292
BVV1252
BVV1242
BVV1232
BVV5261
BVV5251BVV5241
BVV5231
BVV3071
BVV3061
BVV3051
BVV3041
BVV3031
BVV3021
BVV1291BVV1281
BVV1251
BVV1241
BVV1231 GOI898GOI897
GOI662
BVV1311
BVV1302BVV1301
0 500 1,000250Meters
Industrial AreaIndustrial Area
GoitscheGoitscheCity of Bitterfeld City of Bitterfeld
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Estimation of degradation rate in the field
1. NAtotal= ln [contaminant] vs. distance(“bulk attenuation rate”)
2. Normalized using tracer (e.g., chloride)(“degradation rate“)
[m]
PCETCEPCA
Cl-lnC
0 200 400 600 800 1000 1200 1400 1600
Approximation of NA-efficacy
Halflives [y]:T TB Relatively long!
TCE 8.7 7.7PCE 8.5 13.4PCA 8.9 4.6Benzene 16.8 10.3Toluene 9.8MCB 10.0
Kaschl et al., 2004
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Interactions between ground- and surface water
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
StrengbachStrengbach -- discharge of contaminated groundwaterdischarge of contaminated groundwater
0
0,01
0,02
0,03
0,04
-250 0 250 500 750 1000 1250 1500 1750 2000 2250
distance[m]
conc
entra
tion
[mg/
l]
0
0,1
0,2
0,3
0,4
inpu
t con
cent
ratio
n [m
g/kg
]
cis-DCECBInput cis-DCEInput CB
Disappearance or decontamination?
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
Biodegradation of Biodegradation of chlorobenzenechlorobenzene (green), (green), ciscis-- and transand trans--dichloroethenedichloroethene (red and yellow)(red and yellow)
0
20
40
60
80
100
120
0 20 40 60 80 100 120time [h]
[µM
]
Lab and field experiments could prove and quantify rates of biodegradation and make temporarily discharge acceptable for authorities.
Input for ongoing projects using wetlands for decontamination
Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung
Centre for Environmental Research Leipzig-Halle
BenzeneTolueneEthylbenzene m/p Xylene o Xylene
Sum: 4.2 mg L-1
Sum: 1.2 mg L-1
Sum: 0.57 mg L-1
Engineering of Natural Attenuationto manage regional contamination !