kiel economic upheaval in eastern germany – the bitterfeld …...saf16 saf37 goi814 goi819 goi816...

36
Großmann Ingenieur Consult GmbH Dresden Landesanstalt für Altlastenfreistellung Centre for Environmental Research Leipzig-Halle Kiel Hamburg Bremen Schwerin Hannover Magdeburg Berlin Potsdam Dresden Erfurt Düsseldorf Wiesbaden Mainz Stuttgart München Saarbrücken Management of Management of megasite megasite remediation after the remediation after the economic upheaval in Eastern Germany economic upheaval in Eastern Germany The The Bitterfeld Bitterfeld case case Presenting: Administrative, organisational and financial issues M. Keil, LAF Conceptual approach J. Grossmann, GICON Integration of research results H. Weiss, UFZ Kiel Hamburg Bremen Schwerin Hannover Magdeburg Berlin Pot sdam Dresden Erfurt Düsseldorf Wiesbaden Mainz Stuttgart München Saarbrücken

Upload: others

Post on 07-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Kiel

Hamburg

Bremen

Schwerin

Hannover

Magdeburg

Berlin

Potsdam

DresdenErfurt

Düsseldorf

Wiesbaden

Mainz

Stuttgart

München

Saarbrücken

Management of Management of megasitemegasite remediation after the remediation after the

economic upheaval in Eastern Germanyeconomic upheaval in Eastern Germany

–– The The BitterfeldBitterfeld case case ––

Presenting:

Administrative, organisational and financial issues M. Keil, LAF

Conceptual approach J. Grossmann, GICON

Integration of research results H. Weiss, UFZ

Kiel

Hamburg

Bremen

Schwerin

Hannover

Magdeburg

Berlin

Potsdam

DresdenErfurt

Düsseldorf

Wiesbaden

Mainz

Stuttgart

München

Saarbrücken

Page 2: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Economical consequences of the collapse of the former GDREconomical consequences of the collapse of the former GDR–– From planned economy to market economy From planned economy to market economy ––

• As result of the political and economical collapse of the former GDR, the central-planned economy came to an end

• Market-economy had to be established

• Enterprises in public ownership had to be transferred to private ownership

• Private investors for former state-owned companieshad to be found

Investment restraint

contaminated sites

Page 3: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Estimated remediation costs for contaminated sitesin the former GDR

0

10

20

30

40

50

60

1990 1995 2000

Bill

ion

Reduction of the estimated remediation costs due to the conceptual approach since the early 90s.

Page 4: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Remediation costs for contaminated sitesin the State of Saxony-Anhalt

0

0,5

1

1,5

2

2,5

3

Saxony-Anhalt spent until 2005

Bill

ion

Page 5: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Remediation Remediation costscosts –– obstacleobstacle for for privatisationprivatisation ??

Combination: privatisation and management of contaminated sites

financial organisational

Partial or completeexemption of investors fromliability for residual pollution

Establishment of adequatemanagement structures

for site remediation

Responsibility for process of privatisation public institutions

Main aspects ofthe approach

Page 6: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Kiel

Hamburg

Bremen

Schwerin

Hannover Magdeburg

Bitterfeld-Wolfen

Berlin

Potsdam

DresdenErfurt

Düsseldorf

Wiesbaden

Mainz

Stuttgart

München

Saarbrücken

0 100km

Mining activitiessince 18th century, increase in the19th centuryconsiderablechanges in thegroundwaterregime

TheThe Bitterfeld Bitterfeld casecase –– TheThe European European megasitemegasite

End of 19th century: firstsettlementsof chemicalindustry, mainlychlorochemistryLater:

additional productionof aluminium, pesticides, fertilizer, tensides etc.in total 5000 products

Page 7: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

EconomicEconomic collapsecollapse of of thethe regionregion

• Stop of coal production

• Break-down of chlorine chemistry

• 70 % of the jobs lost

Page 8: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

ConsequencesConsequences of of thethe site site useuse

Ecological problems:

• Contaminated groundwater

• Contaminated soil

• Raising groundwater table

Page 9: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Political decision:Continuous site use instead of demolition

Parallel activities:

• Remediation

• Search for investors

• Industrial production

Page 10: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Need for parallel consideration of various interests

• Private investors

• Affected public

• Communal instances

• Regional instances

• Federal instances

• Recultivation of mining areas

• Groundwater management

Page 11: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Stakeholder Stakeholder organisationorganisation in Bitterfeldin Bitterfeld

Federal institution

supreme authority

competent authority

project manager

engineer consultant

competent authority

and projectleader

board

stakeholder

=authorityLegend:= finance

BMF: Federal Ministry of Finance FuB: Manager of Privatisation Contracts on behalf of Federation

SAK: special expert group for groundwater problemsby Goitzsche refilling

StuBA: Tax and budget committee

MRLU:State Ministry of Environment

LaVw: Landesverwaltungsamt, Dessau

LA Geol: Landesamt für Geologie und Bergwesen

=contractcLRA: Landratsamt

MW: State Ministry of Economy

Mining pit redevelopment Groundwater remediation (ÖGP) Improvement of infrastructure

c

c

c

c

cc c

c

StuBA

BMF FuB

MW

LMBV

LA Geol

LAF

SAK Goitsche

control boards

MDSE

concept developer

RPLRA

contractorscontractors

municipalities

inhabitants

P-D CPG

investors

MRLUMW MRLU

LaVw

Source: MDSE

Page 12: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Administrative and organisational structures in Saxony-Anhalt today

– considering remediation of contaminated sites –

• 2000/2001 transfer of complete responsibility to the State Saxony-Anhalt

• Payment of a lump sum of 1 Bill. € for remediation

• Establishment of special organisation LAF (State Authority for exemption from residual pollution liability)

Mission:

To overcome contamination as obstacle for investment

Page 13: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Administrative and Administrative and organisationalorganisational issuesissues √√

ConceptualConceptual approachapproach neededneeded

Management of Management of contaminatedcontaminated megasitesmegasites

√√Financial Financial issuesissues

Page 14: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Industrial landfills

City of Greppin

Industrial area

City of Bitterfeld

Abandoned opencast mines

soil and groundwater

contamination due to

chemical production

over decades

soil and groundwater

contaminationdue to

inadequatedepositing of

industrial wastes

raising of groundwater

table after closure of

lignite mining pits

Problems at Problems at thethe Bitterfeld Bitterfeld megasitemegasite

Page 15: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

ContaminationContamination situationsituation –– quaternaryquaternary / / tertiarytertiary aquiferaquifer

Wolfen

Bitterfeld

Greppin

Quaternaryaquifer

Wolfen

Bitterfeld

Greppin

Tertiary aquifer

Groundwater flowdirection

> 100 mill. m3

contaminatedgroundwater

Page 16: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Initial Initial situationsituation 1990 1990

Problem:

• Large-scale soil and groundwater contamination

• No conceptual approach

Objectives:

• Site re-use, new investments

• Maintenance of existing industrial areas

Conclusion:• Maintenance of industrial site as base for a sustainable site

remediation• only „living“ sites provide financial means for long-term

remediation

Page 17: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

ConceptualConceptual approachapproach to to megasitemegasite managementmanagement (1)(1)

1. Crucial point: Assessing the impact of the source in the soil on otherrecepetors than groundwater

?1

?1

Impact from soilcontamination on surface receptors ?

Page 18: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

ConceptualConceptual approachapproach to to megasitemegasite managementmanagement (2)(2)

2. Crucial point: Assessing the impact of the source in the soil on thealready contaminated groundwater (plume)

2?

2Impact from soilcontamination on groundwater ?

Separation of soil and groundwater management

Page 19: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Separation of groundwater and Separation of groundwater and soilsoil managementmanagement

Large scale contaminated groundwater acts as independent source

Downgradientsafety or

remediationmeasure

Decoupling ofgroundwater andsoil management

Decontaminationmeasures

Risks posed toother receptors /

Considerable impacton groundwaterremediation or

site re-use?

yes no

Groundwater Soil

Measures not required / not proportionate

Page 20: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Remediation Framework Remediation Framework ConceptConcept GroundwaterGroundwaterfor for thethe Bitterfeld Bitterfeld megasitemegasite

Phase 1 and 2

Down gradient

and

Up gradient

Hydraulicsafety

measures

Page 21: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Remediation Framework Remediation Framework ConceptConcept GroundwaterGroundwaterfor for thethe Bitterfeld Bitterfeld megasitemegasite

Phase 3 and 4

Source and plume

Decontami-nation

measures

Page 22: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Sequence “Bayer”

Sequence ”Greppin”

Sequence “Bitterfeld”

Down gradienthydraulic safetymeasures

protectedgroundwater body

(preconditions for separation of soil and groundwater management achieved)

Page 23: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Groundwater Groundwater treatmenttreatment in in

BitterfeldBitterfeld

Page 24: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

CORUSCORUSat at thethe Bitterfeld Bitterfeld

megasitemegasite

before

after

InterlinkingInterlinking remediationremediation and and sitesite developmentdevelopment (1)(1)

Page 25: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

MDP => DRECO, MILTITZ AROMATICS

before

InterlinkingInterlinking remediationremediation and and sitesite developmentdevelopment (2)(2)

after

MILTITZ AROMATICSMILTITZ AROMATICSat at thethe Bitterfeld Bitterfeld

megasitemegasite

Page 26: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

About 10.000 jobs; Operation of selected components of the existing chemical industry (before 1990) was continued

New industries was established on-site e.g.:Akzo Nobel Chemicals GmbH Ausimont GmbH Bayer Bitterfeld GmbHBNT Chemicals GmbH Degussa AG Heraeus GmbH Hüls Indulor Chemie GmbH Miltitz Aromatics GmbHQcells GmbH Sidra Wasserchemie GmbH UmesterungsWerke GmbH

The industrial site Chemiepark Bitterfeld-Wolfen before and today

Page 27: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Berlin Industrie-gebiet Spree

Zeitz

LeunaBuna

Bitterfeld-WolfenMansfelder

Land

Magdeburg-Rothensee

Erdöl-Erdgas Gommern

Südharz

Kali Werra Rositz

BASF

Stadt Brandenburg

Region Oranienburg

Schwedt

SaxoniaFreiberg

Dresden Coschütz/ Gittersee

Lautawerk

SOW Böhlen

Stralsund

RostockWismar

Megasites Megasites in Eastern Germanyin Eastern Germany

Berlin

Page 28: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

VerificationVerification of of thethe conceptualconceptual approachapproach at at EUEU--levelleveland and compliancecompliance check check withwith EUEU--WFDWFD

The WELCOME-project 2000-2004

Goal: Development of a guideline for the management of contaminated megasites characterised by a large-scalegroundwater contamination

The conceptual approach was successfully applied to otherEuropean megasites and transformed into a guideline

Landesanstalt für Altlastenfreistellung

Page 29: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

ComplexityComplexity of of thethe problemproblem requiresrequires cooperationcooperationwithwith researchresearch institutionsinstitutions

Integration of R&D results into Integration of R&D results into megasitemegasite managementmanagement

-- SAFIRA SAFIRA –– Research project; 15 partnersResearch project; 15 partners

-- funded by Federal Ministry of Research and Educationfunded by Federal Ministry of Research and Education

-- coco--financing by LAFfinancing by LAF

-- first phase 1999 first phase 1999 –– 20042004

-- second phase 2005 second phase 2005 –– 20092009

-- decision support system as input to management systemdecision support system as input to management system

Page 30: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

ExampleExample::

traditional approach (i.e. Wiedemeier, U.S. EPA): • contaminant decrease• geochemical footprints• microbiological footprints

in addition, more recent & promising approaches:i. metabolitesii. stable isotopesiii. multi-level samplingiv. BACtrapsv. integrated pumping tests, mass fluxesvi. modellingvii. ...

Making the case for Natural Attenuation

Page 31: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

NA in Bitterfeld: Tertiary aquifer below the City

LK351

LK342

SAF37SAF16

GOI814GOI819GOI816

GOI813

GOI811

GOI809BVV100

BVV092

BVV5262

BVV5252BVV5242

BVV5232

BVV3072

BVV3062

BVV3052

BVV3042

BVV3032

BVV3022

BVV1292

BVV1252

BVV1242

BVV1232

BVV5261

BVV5251BVV5241

BVV5231

BVV3071

BVV3061

BVV3051

BVV3041

BVV3031

BVV3021

BVV1291BVV1281

BVV1251

BVV1241

BVV1231 GOI898GOI897

GOI662

BVV1311

BVV1302BVV1301

0 500 1,000250Meters

Industrial AreaIndustrial Area

GoitscheGoitscheCity of Bitterfeld City of Bitterfeld

Page 32: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Estimation of degradation rate in the field

1. NAtotal= ln [contaminant] vs. distance(“bulk attenuation rate”)

2. Normalized using tracer (e.g., chloride)(“degradation rate“)

[m]

PCETCEPCA

Cl-lnC

0 200 400 600 800 1000 1200 1400 1600

Approximation of NA-efficacy

Halflives [y]:T TB Relatively long!

TCE 8.7 7.7PCE 8.5 13.4PCA 8.9 4.6Benzene 16.8 10.3Toluene 9.8MCB 10.0

Kaschl et al., 2004

Page 33: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Interactions between ground- and surface water

Page 34: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

StrengbachStrengbach -- discharge of contaminated groundwaterdischarge of contaminated groundwater

0

0,01

0,02

0,03

0,04

-250 0 250 500 750 1000 1250 1500 1750 2000 2250

distance[m]

conc

entra

tion

[mg/

l]

0

0,1

0,2

0,3

0,4

inpu

t con

cent

ratio

n [m

g/kg

]

cis-DCECBInput cis-DCEInput CB

Disappearance or decontamination?

Page 35: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

Biodegradation of Biodegradation of chlorobenzenechlorobenzene (green), (green), ciscis-- and transand trans--dichloroethenedichloroethene (red and yellow)(red and yellow)

0

20

40

60

80

100

120

0 20 40 60 80 100 120time [h]

[µM

]

Lab and field experiments could prove and quantify rates of biodegradation and make temporarily discharge acceptable for authorities.

Input for ongoing projects using wetlands for decontamination

Page 36: Kiel economic upheaval in Eastern Germany – The Bitterfeld …...SAF16 SAF37 GOI814 GOI819 GOI816 GOI813 GOI811 GOI809 BVV100 BVV092 BVV5262 BVV5252 BVV5242 BVV5232 BVV3072 BVV3062

Großmann Ingenieur Consult GmbH DresdenLandesanstalt für Altlastenfreistellung

Centre for Environmental Research Leipzig-Halle

BenzeneTolueneEthylbenzene m/p Xylene o Xylene

Sum: 4.2 mg L-1

Sum: 1.2 mg L-1

Sum: 0.57 mg L-1

Engineering of Natural Attenuationto manage regional contamination !